Shanghai High Strength Bolt Factory Company Limited
Industrial distribution
All categories

2017

(Summary description)In 2017 SHTCB provided thermal diffusion sherardized bolt connection pairs to 2 1000MW power generation units of Jiahuwan Power Plant invested and built by Guangdong Baolihua Group with the aim of no corrosion in 30 years;

2017

(Summary description)In 2017 SHTCB provided thermal diffusion sherardized bolt connection pairs to 2 1000MW power generation units of Jiahuwan Power Plant invested and built by Guangdong Baolihua Group with the aim of no corrosion in 30 years;

Information

In 2017 SHTCB provided thermal diffusion sherardized bolt connection pairs to 2 1000MW power generation units of Jiahuwan Power Plant invested and built by Guangdong Baolihua Group with the aim of no corrosion in 30 years;

Previous: 2018
Next: 2017
Previous: 2018
Next: 2017

RELATED NEWS

×

搜索

Search
img
二维码

WeChat official account

Copyright  2023 SHANGHAI PRIME  沪公网安备31010402007356号  沪ICP备10005672号-3

Powered by:300.cn px

Shanghai Prime Machinery Company Limited
沪ICP备10005672号-3