Shanghai Premier Tension Control Bolts Co., Ltd.
07
2022-07
2021
In 2021 SHTCB provided a batch of high corrosion resistant irregular auto parts and components to Bosch Automotive Products Co., Ltd.
07
2022-07
2021
In 2021 SHTCB turned into a qualified supplier of Chint Group, Russian Amur Gas Treatment Project and Qatar World Cup stadiums;
07
2022-07
2020
In 2020, SHTCB provided in total 1.5 million connection pairs and complimentary connection pairs with thermal diffusion sherardized coating to Shanghai metro system and related pipe galleries;
07
2022-07
2019
In 2019 SHTCB provided M16 bolt connection pairs with thermal diffusion sherardized coating used on chassis of Line 15 subway cars of Shanghai Alstom rail transit project;
07
2022-07
2019
In 2019 SHTCB provided 500,000 sets of anti-corrosion bolt connection pairs to the whole steelwork project of Bangladesh PADMA Grand Bridge, a major key project of China Railway Major Bridge Engineering Group Co., Ltd., and also an important pivot of One Belt One Road Initiative;
07
2022-07
2018
In 2018 all small bolts not exceeding M20 on current offshore wind power turbine of Goldwind Science & Technology applied Greenkote sherardized coating;
07
2022-07
2017
In 2017 SHTCB provided thermal diffusion sherardized bolt connection pairs to 2 1000MW power generation units of Jiahuwan Power Plant invested and built by Guangdong Baolihua Group with the aim of no corrosion in 30 years;
07
2022-07
2017
In 2017 SHTCB passed tough anti-corrosion resistance test for offshore platform by National Oilwell and turned into a qualified supplier of that firm;